Log in
Contact
About DrillWell
Research
Home
Photo: IRIS
More precise guidelines for hole cleaning
22.06.2016
IRIS is carrying out a study on hole cleaning for Statoil. The goal is better and more precise guidelines for hole cleaning.
Proper hole-cleaning is essential to avoid potential drilling incidents, such as stuck-pipe or pack off situations. On the other hand, circulating longer than necessary constitutes hidden non-productive time.
Finding a good balance
General guidelines specify time for cleaning the well without considering actual hole conditions. This causes risk of continuing the cleaning process longer than necessary, and thereby wasting time and money.
- Instead of fixed guidelines, we are looking at guidelines for sufficient hole cleaning. By finding the right balance, guidelines can better indicate when the cleaning process is completed, says senior research engineer at IRIS Gunnstein Sælevik.
DrillWell spin-off
A transient cuttings transport model, developed in DrillWell, is used in the project. The model predicts in real time the forming and degradation of cuttings beds and the transport of cuttings in suspension. In this project simulations from the model are compared with replays from drilling operations in eight well sections.
- By comparing simulations with the replays, lessons can be learned about how changes in different parameters indicate trouble ahead. This means Statoil can use their existing software for predicting and avoiding potential drilling incidents, says Sælevik.
Share on
Facebook
Twitter
Linkedin
New Book: Introduction to Permanent Plug and Abandonment of Wells
>Read more
DrillWell Final Report
>Read more
Focus on digitalization technologies and P&A operations
>Read more
DrillWell Seminar 2019 - open for registration
>Read more
DrillWell Annual Report 2018
>Read more
SPE/IADC Drilling Conference 2019
>Read more
Well in line with industry challenges
>Read more
DrillWell makes a difference
>Read more
Erich Suter managed his phD-Defense successfully
>Read more
DrillWell Seminar 2018 - Open for Registration
>Read more
Epic fourth colloquium at the Pulpit Rock
>Read more
DrillWell Annual Report 2017
>Read more
FUNDING OPPORTUNITY FOR MOBILITY AND COURSES IN DATA SCIENCE IN 2018
>Read more
OTC 2018 NorTex Data Science Cluster Workshop
>Read more
SPE/IADC Drilling Conference 2018
>Read more
3D model validation
>Read more
Meet a DrillWell Researcher
>Read more
Reza Askarinezhad defended his Ph.D. thesis
>Read more
FRIPRO Mobility Grant
>Read more
Cementing experiments
>Read more
DRILLWELL AT SPE WORKSHOP ON WELL INTEGRITY IN CANADA
>Read more
Successful playback of data from Ivar Aasen
>Read more
New safe artificial rock for plug and abandonment
>Read more
DRILLING DATA HUB DEMONSTRATION
>Read more
DRILLWELL TECHNICAL SEMINAR 2017
>Read more
Recorded webinar
>Read more
Rice 2017 Data Science Conference
>Read more
DrillWell technical seminar - day two
>Read more
DrillWell technical seminar - day one
>Read more
The annual DrillWell conference Sept 26-27
>Read more
GREAT RESULTS AT DRILLBOTICS 2017
>Read more
DrillWell at OMAE 2017
>Read more
OFFSHORE TECHNOLOGY CONFERENCE 2017
>Read more
Experimental P&A research for the North Sea
>Read more
SPE/IADC Drilling Conference 2017
>Read more
The great drilling automation debate
>Read more
Experimental P&A research for the North Sea
>Read more
Cement evaluation test facility
>Read more
University of Stavanger has made it to the final round in the Drillbotics competition
>Read more
Register for OTC 2017 NorTex Data Science Cluster Workshop
>Read more
Visit to UBC in Vancouver
>Read more
New experimental insights on cement displacement
>Read more
A travelogue from a DrillWell postdoc
>Read more
3D-prints flowrate sensor prototype
>Read more
Meet PhD student Riisøen
>Read more
DrillWell Technical seminar – day 2
>Read more
DrillWell Technical seminar - day 1
>Read more
Project development at NorTex
>Read more
PhD on Optimization of Well Placement
>Read more
Risk of leakage as measurement for quality in P&A solutions
>Read more
New PhD in DrillWell
>Read more
DrillWell seminar September 27&28
>Read more
Get ready for ONS 2016!
>Read more
UT Austin researchers at IRIS
>Read more
More precise guidelines for hole cleaning
>Read more
Site Visit by the Research Council
>Read more
Focus on Data for Drilling Automation
>Read more
DrillWell PhD thesis defended
>Read more
DrillWell results presented and discussed at mini seminar
>Read more
DrillWell presented at OTC
>Read more
SPE/IADC Drilling Conference 2018
>Read more
20 million to drilling project
>Read more
NorTex Data Science Cluster Workshop: Plug & Abandonment
>Read more
Two NorTex workshops at OTC 2016
>Read more
DrillWell at SPE One-day in Bergen
>Read more
DrillWell Annual Report 2015
>Read more
Visit from DTU in Copenhagen
>Read more
DrillWell represented at SPE Symposium in Banff, Canada
>Read more
Green light for the next three years
>Read more
Two new Petromaks2 projects supported by the DrillWell consortium
>Read more
Transient cuttings transport model draws attention
>Read more
First DrillWell PhD dissertation
>Read more
Artikkel i Teknisk Ukeblad 12.11.2015:
>Read more
INTPART-funding to “NorTex Data Science Cluster”
>Read more
Vacant position: Research Fellow in Drilling Engineering
>Read more
The annual DrillWell technical seminar - Day 2
>Read more
The annual DrillWell technical seminar – Day 1
>Read more
Sharing knowledge is the new power
>Read more
Well log interpretation: Will the machines take over our jobs?
>Read more
DrillWell at OMAE 2015 conference in Canada
>Read more
The 1st DrillWell newsletter
>Read more
INTSOK UK-Norway network meeting
>Read more
Collaboration with the new SFI in Agder
>Read more
ROP Management results presented to Statoil
>Read more
DrillWell at SPE Bergen One Day Seminar
>Read more
NPF presentation in Stavanger
>Read more
Lundin joins DrillWell
>Read more
DrillWell paper in Journal of Petroleum Technology
>Read more
SPE/IADC Drilling Conference
>Read more
The 2014 IADC Well Control Conference Europe
>Read more
Paper in JPT Journal
>Read more
DrillWell annual seminar
>Read more
DrillWell present at NPF's Drilling and Well Conference
>Read more
DrillWell at ONS2014
>Read more
Tubing left in hole test
>Read more
SPE Intelligent Energy Conference
>Read more
Tubing left in hole test
>Read more