Production Optimization through Conformance Control

This project aims at a addressing the latest technology listed  in identifying means of diverting the injected water away from the existing highly-conductive paths (extended natural fractures and/or network) into reservoir regions which remain “unswept”, thus (a) reducing the amount of circulated, and at the same time inefficient volume of injected water and (b) increasing the reservoir sweep efficiency and thus increasing oil production and oil recovery factor.